Stone Export Packaging and Arrival Checks: An Overseas Buyer’s Guide

Before ordering stone from China, agree how each piece will be identified, packed, unloaded and checked on arrival. A material quotation alone does not explain how a buyer will receive a heavy, fragile shipment. Packaging drawings, crate records and a receiving plan help connect the approved order with the goods delivered.
1. Match the packaging plan to the stone order
Slabs, cut-to-size tiles, countertops and carved pieces need different support and separation. Ask the supplier to describe the proposed crate or rack, contact protection, edge protection and restraint method. Confirm the package’s gross weight and external dimensions with the forwarder and receiving warehouse. A photograph of another shipment is only a reference; request confirmation for your own order.
- Identify vulnerable corners, finished faces, narrow sections and sink cut-outs.
- Agree piece-to-piece separators and protection for finished edges.
- Confirm whether crates can be opened for inspection and secured again.
- Ask the forwarder to confirm destination requirements for any timber packaging before dispatch.
2. Use crate numbers that connect to the packing list
Each package should have a unique ID that appears on the packing list. Record piece numbers, material, finish, quantity, dimensions and weight. For a room-by-room project, connect piece numbers to the approved layout. This makes it easier to find one damaged countertop without unpacking every crate or confusing similar-looking batches.
3. Prepare the receiving site before departure
Share the access route, unloading location and handling equipment with your logistics provider. Have a competent handling team review package weights and lifting requirements. Do not assume that a standard delivery includes a crane, unloading labour or moving stone inside the building. Agree who arranges these tasks and where the shipment will be stored after unloading.
4. Record condition when the shipment arrives
- Photograph the container or vehicle, seal where applicable, and visible package condition before opening.
- Compare crate IDs and package count with the delivery documents.
- Record wet, crushed, shifted or punctured packaging and note visible exceptions on the receiving record.
- Open packages safely with the handling team; photograph affected pieces with their IDs, a scale reference and an overall view.
- Keep packaging and supporting records until the supplier, carrier or insurer provides instructions. Avoid disposing of evidence prematurely.
5. Agree the damage-report process in advance
Ask for the correct supplier, carrier and insurance contacts before shipping. Confirm notification procedures and applicable deadlines in the relevant contracts and policy; there is no single deadline suitable for every shipment. Send the order number, crate and piece IDs, quantities, photographs and receiving record. Agree any replacement or repair in writing before work starts.
Also record the agreed Incoterms® rule, named place and version. Transport costs, risk allocation and insurance coverage need to be understood together; a freight-inclusive quotation should not be treated as proof of comprehensive damage cover.
Questions buyers often ask
Does strong packaging guarantee no breakage?
No. Packaging is one part of the plan. Handling, restraint, transport conditions and unloading also matter.
What should I send to request a packing proposal?
Send the material, finished sizes, piece count, drawings, destination, delivery conditions and available unloading equipment. Mention cut-outs or delicate details.